Netherlands Wind Blade Recycling Solution

Success Case

Netherlands Wind Blade 'Zero Landfill' Solution

Daily Processing 30 Tons GFRP Crushing & Powdering Line

Location:

Netherlands

Client Type:

Renowned European Waste Management Operator

Material:

Decommissioned/Scrap Wind Turbine Blades (GFRP)

Pain Point:

Imminent landfill ban, high disposal costs

Wind Blade Recycling: Turning Environmental Pressure into Economic Power

With the EU 2024 Waste Framework Directive coming into effect, wind turbine blades are banned from landfill. The client faces the pressure of processing 600 tons of blades annually, with traditional landfill costs as high as €180/ton. A green processing solution is urgently needed.

1. Pain Points: When 'Green Energy' Becomes a 'Grey Burden'

Before contacting us, the client was plagued by the following three major problems:

1. Strict Policy Regulations

The 2024 Dutch Waste Framework Act officially took effect, completely banning wind blade landfills. Illegal disposal faces lawsuits and fines up to €250,000.

2. Skyrocketing Disposal Costs

Due to lack of compliant channels, professional disposal quotes soared to €180/ton. For a company generating 600 tons/year (including 15m long, 8-ton blades), this is an unbearable cost.

3. Extremely Difficult Material

GFRP combines high strength and toughness. Traditional crushers easily jam or break, and cutting causes severe dust pollution, failing strict local environmental assessments.

2. Visual Proof: From Giants to Powder

3. Project Story: Conquering EU Standards

European clients have extremely strict requirements for dust emissions and equipment safety.

Certification Barrier

Equipment must pass CE certification and KEMA electrical safety tests. We completed the EU standard upgrade of the entire electrical system in just 25 days.

Process Innovation: Three-Stage Crushing

Targeting the 'large, hard, and tough' characteristics, we designed a 'Rough-Medium-Fine' three-stage process:
Rough Crushing: Reducing 15m blades to ≤60cm blocks;
Medium Crushing: Further breaking down to ≤15cm;
Fine Grinding: Controlling output size to 1-5mm for construction use.

Economic Calculation

Cost Reduction: Processing cost reduced from €180/ton to €70/ton.
New Revenue: Recycled powder sold as fuel/raw material for cement kiln co-processing at €240/ton.

4. Connected Equipment

Core Line: GFRP Wind Blade Recycling Line

Downstream Application: Cement additives, recycled WPC boards, construction concrete

Leave a Reply

Your email address will not be published. Required fields are marked *

How can we assist you?
Feel free to contact us directly!